Browsed by
Tag: Technology Repair

Alternative Heat

Alternative Heat

In the current crisis conditions reasonably prudent owners looking for new types of heating systems. Today the market of heating systems with a variety of proposals, one of which – the heat pump. This is an excellent replacement conventional gas heating systems are used to supply heat and water resources of the earth and air. Using a warm, natural springs, the heat pump has an impact at 1 kW power is derived from 3 to 6 kW. Period use a heat pump for about 20 years. In Western countries, heat pumps have become distributed in the mid-70's – 80's energy crisis as a result. Rasprostoranennost such equipment in the first place associated with their natural purity.

Heat pump – compact salt / water plant to supply heat and hot water using natural sources with the so-called low potential (seas, soil, subsoil, ground water heat). Nature gives the heat transfer agent with a higher temperature. Heat pumps are circulating pumps, and automated control system. Different types of circulating heating systems are compatible with these plants. Systems with heat pumps work by proper design and accurate calculations, it all depends on the source of thermal energy. Heat pumps with air power source is divided into two types: heat pumps air water and air source heat pumps air.

In contrast, for example, heat pump air pump air geotermalnogoteplovye less expensive. Heat pumps draw heat air air from the air recycling outdoor unit evaporation heat is directed into the room where the capacitor raises the temperature inside. Taking into account the competitive conditions of the distribution system and air have the ability to change, including the possible use of multiple indoor units. Heat pumps air to air systems differ from systems such as air water of lower waste heat. It follows the air temperature on postopayuschego block heat capacitor lower, resulting in improving heat transfer and increase productivity. High efficacy of various combination of the heat pump and underfloor heating. Both production and represent the distribution of thermal energy savings. Efficiency heat pump will be higher due to the underfloor. Common radiator system require special calculations for its operation with a heat pump. Warm floor works fine without any payment to the same ideal for heat pumps. Pros underfloor heating are: the relative humidity remains sex, fit a variety of flooring, even temperature distribution in the premises, there are no drafts in the open air, even heating and so on. Original: Alternative sources of supply

Zingamozhet Layer

Zingamozhet Layer

Store ZINGAi ZINGASOLVneobhodimo in fire-proof place in tightly closed containers in a well ventilated area away from heat, sparks and open flame. APPLICATION ZINGA the protected surface Application ZINGAna protected surface can be done with a brush, dipping, rolling, air and airless spraying. The advantage of covering the lack of bruises and blisters with any inclination of the workpiece. As already said composition should stir every 20 minutes. In the aerial application of the distance to the surface should be 15-30 cm depending on the shape of a torch. Ambient temperature during application can be from -20 to +50 C, the difference between surface temperature and dew point – more than 3 C, maximum relative humidity – 98%.

Under certain circumstances Zingamozhet applied and under more severe conditions. If used as ZINGA self-cover (without drawing on top of other protections), the recommended total dry film thickness should be 80-150 microns. In this ZINGA applied two or three layers of 40-60 microns each. Welds must be pre- to handle a brush. The tension at the corners and edges of the surfaces coated with Zinga, requires application of at least two or three additional layers of previously applied in cases where the surface is exposed to strong corrosion (as mentioned in the section on surface preparation). After the first coat by brush or roller to apply a second coat ZINGArekomenduetsya 1 hour at a temperature of 18-25 C and 15 minutes at 50 – 60 C.

When applied ZINGAraspyleniemvtoroy layer can be applied after the acquisition of the first layer of a uniform light gray color (15-20 minutes). When boleepozdnemnanesenii second (third) layer should be tested for the absence of surface contamination. If the surface layer of the previous hit the dirt, you need to rinse it with water or steam under high pressure (depending on the nature of contamination).